Showing posts with label home building. Show all posts
Showing posts with label home building. Show all posts

Tuesday, December 1, 2009

OUR BRAND NEW HOUSE!!!

Our new Home address:

2221 116th DR SE
Everett, WA 98205



We are settling in nicely and we just LOVE our new home!!

Tuesday, November 24, 2009

The BIG Move & CLEAN-UP!!!

Sorry NO PICTURES!

During our moving week, I left the camera in the car for most of the week. Sorry about that, there are not many FUN pictures to take with grumpy/focused faces, or seeing vehicles crammed full of boxes of our crap. Yes I probably should have captured the moment because we won't EVER be moving again, but oh well, I was busy either, packing, moving, unpacking, or tending to a sick child. Yes we had a flu/cold battle this week too.
We got most of the moving done by ourselves, but had some help with the big stuff. Thank you David, Aunt Natale, Uncle Dave, and Andrew for ALL your help moving the BIG stuff!! And thank you Wendi and Bernie for your help with ALL the boxes and taking the girls for us so we get things done. The girls LOVE spending time with their Gram and Gramps and Duey!

As for the clean-up. Joe and I ROCKED!! We spent several hours during the week of Thanksgiving over at the apartment scrubbing walls, blinds, floors, bathrooms and the fridge. We took a trip or two to the donation place and made sure all the garbage was at the curb for the scheduled pick-up. We had our walk-through with the land lord and She said we did a great job cleaning the place up. We will be charged for the light pink kool-aid stain in Avery's old room (Grant did his best to treat the stain) and for not cleaning the supposedly self-cleaning oven. Oh Well! We should be receiving most of our deposit back....YEAH!

We are settling in nicely and plan to decorate for Christmas this weekend. We are looking forward to showing our house off to our family and friends. We will keep you posted on the Housewarming!!

Monday, November 16, 2009

Finishing UP

Last days of the building process include: painting the front door, blinds installed, window screens installed, door knobs (levers), paint touch-up, cleaning and landscaping.

Our front door....minus door knob....very last thing they do!!
door levers
front yard
GREEN GRASS!!

We have a nice BIG front/side yard and a smaller/short back yard. But we can do LOTS with what we have. We are so excited....and so SURREAL knowing that we will be in our home in just a FEW days!!!

Tuesday, November 3, 2009

10 more WORK days....and 15 days till move-in!!

Every other week or so I get a spreadsheet that lists the progress of our house. We have been patiently watching the days countdown and we are almost at single digits, well shit I should just say it...............we are almost HOME OWNERS!! I wrote the very last rent check last month....<BIG SMILE> That right there is greatness!!

On Sunday we accepted an invitation by Quadrant to take a walk thru of our home. OOPSIE, should we tell them that we visit the house about 3 times a week? Oh well, so we grabbed the provided hardhats and headed to our house with a key and the camera in hand. We were excited because according to the spreadsheet the appliances should have been delivered on Friday, but Monday it would be.

So this is what is new in the house as of today, 11/3/09.
the garage door opens and shuts
we have shelving in the pantry and in all the closets. Natale has already tried to demonstrate "how to climb" the pantry shelves...yikes!

Joe posing in our new shower (did you see what they did to get the thing in there??)

Sinks, faucets and toilets were installed late last week and the mirrors were hung within the last two days.
Hall bath minus mirror (taken Sunday am)
pedestal sink and faucet
toilet
sink in Master bath

one of the Master vanities finished (just dirty)


The carpet was being installed tonight....we headed to the house around 5:15 pm. Apparently the carpet layers work past 5:30 pm. So we sneaked around and took a look and a picture. We were too excited not to get the chance to squish our toes in the new carpet. So after dinner and a bath, we drove back.

This is taken from outside the living room window...one worker was upstairs and one was behind that wall.
messy room
And returning later
Avery was dancing in our living room :)
nice, soft, carpet!!

the fireplace and mantle. ....or TV stand
Joe tested it too and it turns on!!
All that's left to do is paint, door handles, clean-up, front yard landscaping and a few miscellaneous tasks.
We have our orientation and final walk-thru scheduled for the 16th at 10 am, we sign the documents on Tuesday and then we take OWNERSHIP on WEDNESDAY the 18th!! ................(sigh) WOW!!

Sunday, November 1, 2009

oops!!

For a few weeks now, we (or I) have been wondering why our Master bathroom shower enclosure was not installed yet? Its been just green board for weeks and the other shower was installed so why the delay? Well, it must of broken in shipment or something??
Late last week, the shower enclosure arrived and was too wide for the door ways so here is what they did.....


They CUT UP MY NEW HOUSE!!
Big mess

yikes.....big problem??
for this.....our shower
And its been fixed now!!
Mama feels better!!

Tuesday, October 27, 2009

tile & counter tops

Tonight, we drove by the house to see the progress. We have counter tops and tile.


Halloween themed girls in their bedroom

Kitchen counter tops and this is our island



Avery is showing off her bathroom counter top

And a close up on our Master bath counter top
The mantle
And the soaking tub in the Master bath


More to come....carpet and paint!!





Friday, October 23, 2009

Doors and Cabinets

On Wednesday night 10/20/09, we headed to the house to see the progress. The millwork is being done. So here ya go.....
the mantle
a door
1/2 bath framed door

staircase
Kitchen vinyl, 1/2 bath and entry.

upstairs vinyl flooring bathrooms and laundry room
Kitchen cabinets
The girls bathrooms with Natale wanting to climb in for a bath....
One of the vanities in the Master bath

As of today, we will be at DAY 38, which means 16 work days until our HOME is completed!!

Friday, October 9, 2009

HOUSE UPDATE!!

OK, lots to share.....
First off, As of Thursday 10/8/09 we are half way done. We are at Day 29 of 54 on Monday. So here is what's been going on at the house these last 7-10 work days.

Digging up electrical line and getting the meter attached to the house.


We have wall board (drywall). These first pictures were taken last Friday 10/2/09.
second bedroom
Kitchen
entry
lots of seams
And then on Wednesday evening the heat was on and the mudding and taping had been completed

as you enter the house
fireplace and mantle. There will be a tile are the fireplace
Having walls was a bit strange for me...we had been looking through walls now for a few weeks

third bedroom and faces the front of the house
Natale playing in Mama's room
The master bathroom has green board and Natale wants to have a bath or a shower??
Our GARAGE DOOR was installed!!
from inside
outside

They started to frame the walkway and driveway



just poured driveway

finished driveway

wet walkway
finished walkway and the girls

back porch being troweled (the guy didn't see me)
finished back porch

house as of tonight...10/9/09
Next week we should be getting our cabinets delivered and they start to texture the walls and paint the inside of the house.