Friday, October 9, 2009

HOUSE UPDATE!!

OK, lots to share.....
First off, As of Thursday 10/8/09 we are half way done. We are at Day 29 of 54 on Monday. So here is what's been going on at the house these last 7-10 work days.

Digging up electrical line and getting the meter attached to the house.


We have wall board (drywall). These first pictures were taken last Friday 10/2/09.
second bedroom
Kitchen
entry
lots of seams
And then on Wednesday evening the heat was on and the mudding and taping had been completed

as you enter the house
fireplace and mantle. There will be a tile are the fireplace
Having walls was a bit strange for me...we had been looking through walls now for a few weeks

third bedroom and faces the front of the house
Natale playing in Mama's room
The master bathroom has green board and Natale wants to have a bath or a shower??
Our GARAGE DOOR was installed!!
from inside
outside

They started to frame the walkway and driveway



just poured driveway

finished driveway

wet walkway
finished walkway and the girls

back porch being troweled (the guy didn't see me)
finished back porch

house as of tonight...10/9/09
Next week we should be getting our cabinets delivered and they start to texture the walls and paint the inside of the house.